Introducing Frame Compute
Delivering hyperscaler levels of AI compute faster and cheaper than conventional data center buildouts.
Configuration
Choose from three GPU density configurations
The Terawatt Gap
AI is transforming global energy demand, ending decades of flat growth.
By 2030, U.S. electricity demand could outpace supply by over 1,300 TWh due to infrastructure bottlenecks.
1.3K TWh
Projected demand gap by 2030
7K TWh
High demand forecast by 2030
5.7K TWh
Supply forecast by 2030
Historical: EIA Monthly Energy Review, Table 7.6
Supply forecast: EIA Annual Energy Outlook 2025 Reference Case
Reference demand: IF / Pew Charitable Trusts, America's Electricity Future
High demand: Grid Strategies, National Load Growth Report
Capacity
Frame Compute's micro data centers connect to existing behind-the-meter power infrastructure in homes and businesses, unlocking untapped capacity for AI inference workloads.
Up to 180A ready to compute.
140A
available
180A
available
EARN ON INFERENCE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Frame Compute at Home
at $1.07/GPU/hr
Conservative
Est. Cost: $152
$0/mo
56% util.
Expected
Est. Cost: $214
$0/mo
86% util.
Optimistic
Est. Cost: $242
$0/mo
100% util.
Conservative / Expected / Optimistic based on current marketplace utilization
*Electricity cost estimated at selected rate per kWh.
Hardware
Purpose-built to be easily installed outdoors. Each node is self-contained, quiet, modular, serviceable, and secure.
Frame Compute at Home
Compute Income, High-Speed Internet, Battery Backup, and Supplementary heating.
Your compute unit will be sourced to the Frame Compute Cloud generating a recurring income
Fiber connectivity that benefits both the compute node and your home network.
Power bank backup to supply your home and the compute unit during outages.
Excess heat from compute nodes help supplement in-home heating.